Free Trade Pricing EstimatorJob Pricing Estimator & Trade Calculator UK

What should you charge for any domestic trade job?

Free to use No signup required Realistic market benchmarks
Free Trade Tools/Job Estimator
Free Trade Tool

Enter Job Details

Describe the job in plain English and get a realistic UK price benchmark based on labour, materials, waste and plant.

0/1000
Try an example
🇬🇧 United Kingdom (£ GBP)
Free·No account·No card

Why is this benchmark different?

Not an AI price guess. AI understands what you've described. GoTaskhub's pricing model then calculates the benchmark using United Kingdom trade rates for labour, materials, waste and plant.

✓ United Kingdom trade benchmarks✓ Itemised calculation (GBP)✓ No account required
The GoTaskhub Flow

From instant benchmark to client quote

Check your numbers against current UK trade benchmarks, then turn it into a winning quote.

01. Get your benchmark

Describe any job in plain English. Free · No account · No card.

02. See where the money goes

Itemised labour hours, materials, plant, skips, and trade margin.

03. Turn into a quote

Turn your estimate into a professional quote with GoTaskhub. Free account.

Trade Pricing Principles

How to price domestic trade jobs accurately in the UK

Pricing domestic trade work accurately requires calculating material costs, waste disposal, plant hire, direct tradesperson hours, and operating overheads. Whether you are quoting a bathroom refit, consumer unit replacement, patio installation, or structural alteration, GoTaskhub gives you deterministic UK trade benchmark prices based on verified merchant data.

UK Price Benchmarks (Ex. VAT)

Standard Domestic Trade job cost benchmarks

Auditable UK material, labour, and commercial price ranges. Figures exclude VAT and assume standard residential site access and prevailing trade merchant prices.

Typical Job ScopeLabour DurationTypical Benchmark
Consumer Unit Replacement (10-way dual RCD / RCBO board & testing)
Materials: £200 - £350 (Board, RCBOs, meter tails, bonding)
1 day (1 electrician)£650 - £950
Bathroom Suite Refit (Bath, basin, close-coupled WC, thermostatic shower)
Materials: £1,400 - £2,200 (Sanitaryware, valves, copper/speedfit, waste, skip)
4 - 5 days (1-2 plumbers)£3,500 - £5,200
20m² Porcelain Patio (Excavation, MOT sub-base, priming slurry, jointing)
Materials: £1,100 - £1,650 (Tiles, Type 1, slurry, brush-in compound, 8-yd skip)
3 - 4 days (2-person crew)£3,200 - £4,600
RSJ Steel Beam Knock-Through (3.5m internal load-bearing wall opening)
Materials: £1,100 - £1,800 (Universal beam, padstones, Acrow hire, skip)
2.5 - 3.5 days (2 builders)£2,800 - £4,200
Worked Example: Bathroom Suite Replacement & Shower Installation
Materials

£1,650 (Suite, thermostatic mixer shower, brassware, copper fittings, waste pipe, tiling adhesives)

Plant & Waste

£340 (1x 6-yard skip for old sanitaryware and wall tiles)

Direct Labour

£1,600 (4 days @ £400/day skilled plumbing & finishing)

Overhead & Target Margin

£550 (15% operating overhead & target business margin)

Calculated Benchmark Total: £4,140 + VAT

Assumes standard domestic cold-water storage or combi boiler with ground/first floor access.

Turn into customer quote
Regional Multipliers

UK Regional Pricing Multipliers & Labour Variance

Trade labour and operating costs vary by up to 35% across the UK due to congestion, travel times, merchant pricing, and local living costs. Use these regional multipliers to adjust national baseline estimates.

UK RegionCost MultiplierTypical Day Rate
London & Inside M251.20x – 1.30x£360 – £520 / day
South East & Home Counties1.10x – 1.15x£300 – £420 / day
Midlands & South West1.00x (Baseline)£260 – £350 / day
North, Wales & Scotland0.90x – 0.95x£230 – £320 / day

Common Pricing Pitfalls in Domestic Trade

Where tradespeople most frequently lose margin when quoting domestic trade work.

Forgetting non-billable setup, travel, and collection time

Merchant collections, site setup, customer walk-throughs, and packing down tools add 15-20% to true job duration that must be factored into your day rate.

Underestimating disposal, skips, and plant hire costs

Skips, grab lorries, equipment hire, and delivery surcharges represent direct job costs that directly erode your profit if omitted from your estimate.

Not pricing in a realistic profit margin buffer

Covering your hourly wage is break-even, not profit. Every domestic job needs a 15-25% gross margin buffer to fund tool replacement, vehicle maintenance, and slow periods.

Underlying Methodology

How our domestic trade estimator calculates your price

Our pricing estimator combines deterministic UK merchant cost models, verified trade labour durations, plant hire benchmarks, and regional price indices to calculate a reliable, transparent price range rather than an AI-generated guess.

Materials

Current trade merchant rates with realistic wastage allowances.

Direct Labour

Verified UK trade person-hours divided by standard crew size.

Waste & Plant

Skip hire, tool fuel, and specialized equipment costs included.

Overheads & Margin

Fixed operating overheads and target gross profit margins.

Your estimate is based on the information provided

Estimates make standard assumptions where details are missing (e.g. domestic property, clear ground-floor access, standard UK trade practices). You can refine any assumption during the calculation. Unknown site conditions, concealed obstacles, or specification changes can alter the final price. That's why we give you an explainable price range with the assumptions clearly stated, rather than pretending there is one fixed price.

Domestic Trade pricing FAQs

Common questions on domestic trade day rates, material allowances, and pricing structures.

Want to understand how job pricing works?

How to Price Jobs Profitably (How to Quote a Price for a Job)

Learn the exact formula for pricing domestic trade work without underquoting. Covers labour, materials, plant hire, fixed business overheads, and target gross margin.

Read guide

Other Free Trade Calculators

Explore our full suite of free UK trade estimators and pricing tools.

View all tools
Connected Workflow

The estimate isn’t the end result. It’s the starting point.

Review the benchmark, adjust line items, add your branding, and use GoTaskhub to create and send professional job quotes to your customer. When accepted, turn it straight into a scheduled job and invoice.

Step 1
Estimate
Benchmark costs
Step 2
Quote
Live preview
Step 3
Accepted
Client agrees
Step 4
Job
Schedule visits
Step 5
Google Sync
Calendar updated
Step 6
Payment
Invoice & card pay
Run your business with GoTaskhub • Free plan includes up to 3 quotes and 3 invoices per month. No credit card required.